D4.2 Report on results of the validation

Deliverable D4.2 gathers the results obtained in the different tests performed during the first and second experimental campaigns, carried out in the R&D testing platform built in WP3 at Fundación Hidrógeno Aragón (FHA).
D 5.3 – Intermediate report: key findings on potential and enablers

D5.3 reveals that large scale hydrogen separation costs can be decreased to 13,812 €/m2, which is 37% lower than lab scale separation.
D4.4: Final report on systematic validation of the experimental material testing campaign
Report is coming up soon