Deliverable 5.10 Report on economic analysis of test cases

This report deals with the economic aspects of SNG injection for different combinations of SNG plants and gas networks, as well as of optimised operation schemes for the gas networks. Next to the demo plants and the connected gas grids from within this project, combinations of several typical test grid topologies and increased plant sizes are considered in this Deliverable, when calculating costs for injecting SNG under different network operation schemes. In addition, the capacities of the gas infrastructure and the connected underground storages for long term storage of currently natural
gas, in the future SNG, are shown.

Click here to download the complete artice.