Deliverable 6.6 Report on the impact of PtG on selected scenarios

Deliverable 6.6 Report on the impact of PtG on selected scenarios This Deliverable presents the results obtained by investigating the interaction between the future electricity transmission system and the Power-to-Gas (PtG) technology. In the framework of the project STORE&GO, Work Package 6 (WP6) focused on the modelling and simulation of PtG into the electricity system, […]

Deliverable 6.7 Final report “PtG grid integration experiments”

Deliverable 6.7 Final report “PtG grid integration experiments” This Deliverable focused in particular on how to integrate the information about the facilities replicating the real world condition into a simulation environment. For doing this, the concept of remote Physical Hardware-in-the-Loop (PHIL) has been used and exploited. Remote simulation with physical hardware appears to be an […]

Deliverable 5.10 Report on economic analysis of test cases

Deliverable 5.10 Report on economic analysis of test cases This report deals with the economic aspects of SNG injection for different combinations of SNG plants and gas networks, as well as of optimised operation schemes for the gas networks. Next to the demo plants and the connected gas grids from within this project, combinations of […]

Deliverable 5.9 Final report on evaluation of technologies and processes

Deliverable 5.9 Final report on evaluation of technologies and processes The report presents the technical as well as the economic evaluation of the three different demo sites. Therefore, the system boundaries are carefully chosen and performance indicators are defined within the project. To test the long term stability and the load flexibility of the demo […]

Deliverable 2.7 Final report on dissemination activities for the Falkenhagen plant

Deliverable 2.7 Final report on dissemination activities for the Falkenhagen plant This report summarises the dissemination and communication activities that were undertaken by STORE&GO all around the german demonstration plant in Falkenhagen and the achieved results. Target groups of the dissemination actions are described, as well as the hosted on-site events, the guided tours at […]

Deliverable 9.8 Final communication and dissemination report

Deliverable 9.8 Final communication and dissemination report This final report on the dissemination and communication activities of STORE&GO summarises the activities undertaken by WP 9 and the other partners of the STORE&GO project over the complete project runtime to adequately support this lighthouse project, and to communicate its core messages and results to the relevant […]